New construction of 300 lot subdivision to urban design standards including hy-span box culvert installation and extensive storm water retention ponds.
New municipal water and sewer systems.

Coordinated with subcontractor Nottawasaga Valley Conservation Authority for environmental work
Directional drilling work and work to the existing pumping station. Major dewatering due to high water table. Over 2.5 km of watermain installed.

The subdivision also included the development of small playground, quite greenspace, and multiuse pathways. The area was fully developed to provide safe and accessible leisure space for local residences. Communal areas were also developed near the waterways to provide a space for local residence to enjoy as groups or for individual use.