Scope of works: 1200 m of 500mm and 1200 m of 400mm CPP watermain installation by open cut and microtunneling method. Consecutive tunnel drives and open cut installations. Road reconstruction and restoration. Sanitary and forcemain realignment and connection. Own forces for all open cut installations.

Trenchless crossings coordinated by KAPP by microtunnelling, directional drilling, and suspended stainless steel watermain. Coordination and protection of utilities including vital gas main, under and above ground hydro duct mains. Project required major phasing to accommodate occupancy in surrounding area.

Significant work required to maintain best practices for environmental protection. Substantial work required in occupied urban environment and environmentally sensitive area