KAPP is the subcontractor for all linear works on this project, but we were also responsible for excavating the wet well for the pumping station and various shafts for microtunneling work throughout the project.

The project required watermain works including 1500m of 60mm CPP and 750m of 750mm CPP, valve chambers, 900mm concrete liner by microtunneling. Sanitary sewers, including up to 1500mm pipe installation by open cut, as well as microtunneling installation, shaft development. Erosion and sediment control measures.

Trenchless crossings were coordinated by KAPP by microtunneling as well as jack & bore methods. Coordination & protection of utilities including vital gas main, under and above ground hydro duct mains.

Project required major phasing to accommodate occupancy in surrounding area. Significant work required to maintain best practices for environmental protection.